Skip to content
  • Process Safety and Engineering Services Brisbane | Pro Engineers
  • HAZOP Studies & Workshop Facilitation | Pro Engineers
  • HAZID Studies & Facilitation | Pro Engineers
  • Bowtie
  • LOPA Studies & Facilitation Australia | Pro Engineers
  • Functional Safety Engineering Services | Pro Engineers
  • Insights
Pro Engineers
  • Process Safety and Engineering Services Brisbane | Pro Engineers
  • HAZOP Studies & Workshop Facilitation | Pro Engineers
  • HAZID Studies & Facilitation | Pro Engineers
  • Bowtie
  • LOPA Studies & Facilitation Australia | Pro Engineers
  • Functional Safety Engineering Services | Pro Engineers
  • Insights
Talk to an engineer
Pro Engineers
  • Functional Safety

SIF vs SIS: Understanding Safety Instrumented Functions and Systems

Safety Integrity Level SIL risk reduction reference

SIF and SIS are closely related functional safety terms, but they are not interchangeable. Confusing them can lead to unclear requirements, poor testing strategies and incorrect statements such as “the whole safety PLC is SIL 2.” In practice, functional safety…

  • marketing
  • September 22, 2026
  • Functional Safety

IEC 61511 Functional Safety Lifecycle: What Process Facilities Need to Manage

Safety Integrity Level SIL risk reduction reference

Functional safety is not achieved by purchasing a safety PLC or specifying SIL-rated equipment. It is achieved by managing Safety Instrumented Functions through a lifecycle that begins with hazard identification and continues through design, installation, operation, maintenance, modification and decommissioning.…

  • marketing
  • September 22, 2026
  • Functional Safety

SIL Assessment and Classification: From Hazard Scenario to Target SIL

Safety Integrity Level SIL risk reduction reference

A Safety Integrity Level should not be selected because a shutdown function “feels critical” or because similar equipment has historically used a particular SIL. The target must come from a defined hazardous scenario, a tolerable-risk basis and a structured assessment…

  • marketing
  • September 22, 2026
  • Process Safety

Bowtie Risk Assessment for Major Accident Events: From Threats to Critical Controls

Process safety workshop facilitation

Bowtie analysis provides a visual way to connect the causes of a major accident event with the preventive and mitigative controls intended to manage it. When used well, it helps engineering and operations teams move beyond a list of hazards…

  • marketing
  • September 22, 2026
Prev
1 2 3 4 5 6
Next
© 2026 Pro Engineers · Brisbane, Australia · info@proengineers.com.au · 0422 354 755